- Client:
Restauranteur venturing into a new menu
- Program:
Construction Management
- Type of Construction:
- Masonry, clad with wood siding
- Critical Factor:
Dealing with some original faults with the building could have easily delayed the schedule and significantly increased the cost. Brentwood's solutions team was able to solve the problems with a minimum of impact.
- Brentwood point of difference:
Brentwood's expertise in dealing with a number of different trades allowed us to coordinate the schedule and complete the project on schedule for the grand opening.
After
Before